Future U Project Documents
CONTACT US

Search Our Site

Snapcode for CSULBASI
@CSULBASI
Beach Pantry Banner

Survey

The Future U Project survey opened on Dec. 5, 2022, and closed at 11:59 p.m., Feb. 10, 2023. During that period, we received:

  • 7,555 Total Respondents
  • 5,993 Total Completed Surveys (79.32% completion rate)

Detailed survey responses and results can be found in the Student Fee Advisory Committee Report. We cannot thank you enough for your feedback and we hope that you continue to connect with us.

SFAC Report

The final Student Fee Advisory Committee (SFAC) report is the result of many discussions, feedback sessions, and collaborative efforts, which involved the entire campus community. It provides an overview of our engagement efforts, insights gained, and recommendations for the next steps in our journey to create a Future U that meets the needs of students now and in the future.

We presented this report on April 28, 2023, for the committee's consideration. SFAC voted to approve the proposal to renovate and expand the USU. See the full report here.

Feasibility Study

The feasibility study, conducted in collaboration with Canon Design, was a critical step in our journey to enhance student life on campus. Throughout the 2023-2024 academic year, we investigated the existing building and land to assess the project's feasibility. Our goal was to ensure that the proposed renovations and expansions meet the needs of our campus community while staying within budget. This study provides conceptual designs for the renovation and expansion, emphasizing how all the programmatic elements of the building and organization can be accommodated.

Additionally, the study was pivotal in confirming that our financial investments are sound and aligned with our strategic objectives. The report outlines the potential for transforming the USU into a vibrant hub for all LBSU students, offering a comprehensive overview of our findings and insights. See the full report here.